Shanghai Industrial Boiler Co., Ltd./Shanghai industrial boiler (Wuxi) Co., Ltd.
Solution
Application area

Shanghai industrial boilers provide a one to one solution for different industry attributes and needs of customer enterprises.



Engineering generalcontractor

Shanghai industrial boiler is also committed to providing customers with energy conservation and environmental protection boiler project package solution.

Power station boiler EPC package
Shanxi Gaoyi Iron and Steel Co., Ltd. 15MW high temperature and extra high pressure gas power generation project
Unit operation mode:

A 190t/h high-temperature ultra-high pressure gas boiler (blast furnace gas mixed with converter gas) +1 15MW high-temperature ultra-high pressure back pressure steam turbine unit, steam turbine back pressure parameters: 3.9MPa (a), ~ 373 °C. The back pressure of the steam turbine is returned to the boiler reheater, and the steam temperature is raised to 450 ° C and sent to the steam blower of the steel mill.

Fuel fuel:Mixed gas of blast furnace gas and converter gas
Ignition method:Liquefied gas ignition

In principle, the boiler operates at base load, but has variable load peaking capability. The boiler has good adaptability to the sliding pressure operation and the constant pressure operation.

The time from ignition to full load of the boiler meets the following requirements under normal starting conditions:

Cold start (stop more than 72h)6~8 hours

Warm start (stop 10-72h)3~4 hours

Hot start (within 10 hours of shutdown)1.5~2 hours

Temperature adjustment method:The superheated steam is cooled by two-stage water spray; the reheated steam is cooled by a small amount of water spray.

The service life of the boiler is 30 years, and the life of the convective heating surface flushed by the smoke is more than 120,000 hours. The overhaul interval is 5 years.

The project has been put into operation according to the installation, and all the indicators have reached the predetermined requirements.



Boiler modification

Shanghai industrial boilers can be retrofitted by assembling a Seiko retrofitting team, which can be customized according to customer requirements according to local conditions.

With the continuous improvement of national energy policy and environmental protection requirements, Shanghai Industrial Boiler Co., Ltd. and Shanghai Industrial Boiler (Wuxi) Co., Ltd. have carried out in-depth research and development on the transformation of coal-fired boilers.

Shanghai Industrial Boiler Co., Ltd. and Shanghai Industrial Boiler (Wuxi) Co., Ltd. are willing to customize various boiler renovation solutions for the majority of users.
In order to improve the performance of the original boiler and reduce the emission concentration of the boiler, for the country's energy-saving and environmental protection cause to make due contributions.


Equipment installation

The quality of the engineering installation directly determines its effect after being put into use.

×
主站蜘蛛池模板: 狠狠色噜噜狠狠狠狠黑人 | 2024在线看日本三级| caotube 超碰| 1024手机在线视频| 色七久久久久综合影院| 噜噜噜综合亚洲| 国产毛片高清无打码在线| 国产成人精品福利网站app| 91亚洲一区二区在线观看不卡| 亚洲人禽杂交| 欧美日韩综合网| 久久国产高清字幕中文| 国产制服丝袜在线91| 丁香婷婷五月天综合| 亚洲天堂网在线观看视频| 日日夜夜人人精品一区三区| 伊人影视在线观看日韩区| 香港三级日本三级妇三级| 麻花传媒MV一二三区别在哪里看| 国产午夜毛片一区二区三区| 国产成人免费福利a片| av狼日韩在线| 天美传媒在线观看| 麻豆文化传媒有限公司官网首页| 国产三级日本三级日产| 岛国在线观看一区二区三区| 亚洲男人第一无码av网站| 免费久久精品| 国产乱理伦片在| 91精品综合久久久久m3u8| 日本无人区码一二三区别| 精品国产一级毛片国语版| 成人一区二区三区综合区精品久久久中文字幕一区 | 国产无人区卡一卡二卡乱码 | 国产视频三区| 99久久伊人精品波多野结衣| 少妇做爰奶水狂喷AV| 久久99国产精品片久久99蜜桃| 国产91丝袜在线播放| 亚洲精品一区二区三区福利 | 人妻熟女一区二区AV|