亚洲动漫精-亚洲东京热国产精品无码视频-亚洲东京热av一区二区-亚洲丁香五月天缴情综合-亚洲丁香五月天缴-亚洲丁香五月天

Shanghai Industrial Boiler Co., Ltd./Shanghai industrial boiler (Wuxi) Co., Ltd.
Solution·Application area
Glass industry
The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
    

 

    
Glass kiln waste heat power generation process flow chart

The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.

2018/08/16 14:44:43

15162

Prev Next
×
主站蜘蛛池模板: 狼色精品人妻在线视频网站| 少妇偷拍精品高潮少妇| 内地三级视| 国产亚洲综合视频| 成人欧美一区二区三区在线观看| av片在线播放| 无码高清晰| 久久久久久影院| 国产微拍精品一区一再猛点| 插影院| 亚洲AV在线一区二区三区| 美女视频一区二区三区在线教室内污辱女教师在线播放 | 成人精品国产亚洲AV久久| 中文字幕日韩精品无码内射| 五月情视频在线观看| 欧美老头把我添高潮了A片视频| 久久精品国产精品亚洲精品| 国产激情对白一区二区三区四| 2024天天拍天天摸天天爽| 无码欧美毛片一区二区三| 久久天堂一区二区三区| 国产精品熟女视频一区二区| 91精品国产9| 日本韩国台湾香港三级| 久久久精品免费| 国产欧美韩国日本一区| AAAAA特级| 日韩中文人妻无码不卡合集| 久久人妻精品一区二区三区hd综艺手机在线观看 | 亚洲啪啪| 蜜桃av噜噜一区二区三区| 国产欧美一级精品视频| 成aⅴ人免费观看中文字幕| 亚洲 自拍色综合图区| 久久久久久久影院| 国产激情无码一区二区| 亚洲综合色成在线播放| 欧美69久成人做爰视频| 国产欧美熟妇另类久久久| 91久久嫩草影院免费看无卡顿| 天天草天天流|